HomeProjects

Project Portfolio

Explore our extensive portfolio of completed projects.

Hudson Falls Horizontal

General Electric commissioned a polychlorinated biphenyl (PCB) cleanup project at their Hudson Falls Plant in New York state. Before PCB regulation in the 1970’s, over...

View Project
Jackson Hole Tram

Jackson Hole Mountain Resort announced the retirement of their historic, 40-year-old aerial tram at the end of the 2006 summer season. The tram was an...

View Project
Palms Casino Underpinning

Project Description Original construction of the pool area at the Palms Hotel involved backfilling the location and constructing a pool deck and associated structures on...

View Project
Ebey Slough Replacement

Puget Sound Energy (PSE) commissioned the stringing of 2.5 miles of 115 kV and 230 kV transmission line, as well as the replacement of 80...

View Project
Lake Mead Intake No. 3

Southern Nevada Water Authority (SNWA) investigated the construction of a large diameter water-supply tunnel from their existing water treatment plant into Lake Mead’s Boulder Basin....

View Project
Central Pool Augmentation

The Central Pool Augmentation (CPA) Project included the construction of a new water treatment plant in Riverside County, California to provide for growth in Riverside,...

View Project
The Dalles Dam Fish Guidance System

The Dalles Dam is a hydroelectric dam located on the Columbia River 2 miles east of The Dalles, Oregon. The US Army Corps of Engineers...

View Project
Juneau Access Road

A road to provide access between Juneau and the continental road system has been proposed for decades. The only alternative to air transportation to and...

View Project
Hoover Dam Bypass

The Hoover Dam Bypass Project was conceived to address a number of issues related to the functionality of US 93 and its crossing of the...

View Project
Copyright © 2021 Crux Subsurface, Inc.
Back to Top