Location: Spokane, WA

Project Description

The foundation of a single-story commercial building in downtown Spokane was in need of repair due to differential settlement issues. A decomposing organic layer at depth caused the uneven settlement and a portion of the building was descending into the surrounding ground.

Team Members

Web Properties, Crux Subsurface Inc., DCI Engineers, Quanta Subsurface

Crux’s Role

Crux provided 100% design-build services for micropile installation as a means of settlement mitigation. 29 micropiles were installed around the building perimeter to support the exterior concrete tilt-up panel walls. Two verification piles were installed to confirm micropile design.

Concrete and asphalt was cut around the perimeter of the building followed by trench excavation adjacent to the building. Micropiles were then installed along the west, north and east exterior of the building, spanning roughly 324 feet of wall. Crux installed both Type A and Type B micropiles, and proof tested a portion of these piles. The piles were drilled into native materials, ranging from 10 to 60 feet in depth. The materials directly above bedrock were less consolidated than typical, presenting additional challenges to drilling operations. Once micropile installation was complete, a cast-in-place concrete grade beam was constructed around the perimeter of the building to tie the piles to the concrete tilt-up panels.

Micropile drills had to be placed within 12 inches of the building for successful installation, requiring specialized, compact drilling equipment and extensive experience underpinning structures. The building remained in use throughout construction and all work was successfully completed without major interruption to its tenants.

 

 

Related Projects

Lolo-Oxbow 230 kV Transmission Line Rebuild

Micropile design and construction for four remote-access river crossing structures requiring an alternative foundation option.

View Project
Antimony to Burke A&B Transmission Rebuild

Project Description The Antimony to Burke project involved the rebuild of an approximately 13-mile 115 kV transmission line between Western Montana and Eastern Idaho.  The...

View Project
Paris to Ark City Transmission Line

Project Description The Paris to Ark City Transmission Line involved upgrading an existing power system originally built in the 1940’s and nearing the end of...

View Project