HomeNewsNewsThe Western News: Flower Creek Dam Testing

The Western News: Flower Creek Dam Testing

Published on Back To Index

A geotechnical investigation of the Flower Creek Dam was initiated after a recent inspection report called the structure’s integrity into question.

Crux provided drilling and sampling services on the project, obtaining concrete core samples on the downstream face of the dam.  17 six-inch diameter core samples were obtained in total, ranging in depth from 14 to 18 inches.  To access the boring sites, Crux installed multiple anchor points along the crest of the dam in line with each setup location.

The results of the geotechnical analysis will provide the necessary information to determine whether the dam needs to be replaced, or simply requires a new maintenance and upgrade plan.

Read the article from The Western News → 

Recommended Posts

Back to Index
Uncategorized
Crux Recognized as an ADSC Safety Award Winner

September 1, 2020 The International Association of Foundation Drilling (ADSC) has named Crux a Safety Award Winner for the calendar year 2019.  Crux is recognized in the 100,000-300,000...

Learn More
News
Crux Announces New President

January 13, 2020 Crux Subsurface, Inc. (Crux) is pleased to announce Scott Tunison as company President. Mr. Tunison co-founded Crux in 1998 and has seen the company through...

Learn More
News
Crux Participates in ISM 2019, Australia

August 23, 2019 Crux engineers were in Australia’s Gold Coast this week to present case studies and participate in expert panel discussions at the 14th International Workshop for...

Learn More
Copyright © 2022 Crux Subsurface, Inc.
Back to Top