Original construction of the pool area at the Palms Hotel involved backfilling the location and constructing a pool deck and associated structures on top of this material. The compaction of fill along the pool deck was poor, which created structural settlement problems for the pool and surrounding spa, restaurant and night club. During a later renovation of the pool area, the Hotel commissioned simultaneous foundation work to negate the settlement issues. This involved the remediation of sub-grade soils and underpinning of the pool area and adjacent structures.

Team Members

Palms Casino and Resort, Whiting-Turner Contracting Company, Northwest Cascade Inc. and Crux Subsurface, Quanta Subsurface

Crux’s Role

Crux was contracted as a joint venture with Northwest Cascade, Inc. to perform soil remediation and install micropiles for underpinning. Minimal disturbance to the Hotel’s daily operations was crucial, requiring work to be completed during off-peak hours. To accomplish this, interior locations were underpinned during nighttime hours, and all equipment and materials were removed from the spa and restaurant areas prior to their opening each morning.

Micropiles were installed along the outer footprint of the pool deck and within the interior of the Hotel restaurants, spa and night club. Access and working areas were limited to small drill equipment, and in some locations required equipment suitable to work within closet-sized rooms. To minimize impacts on the Hotel, a specialty system was designed to move drill cuttings and spoils from the project site to a remote staging location during drilling operations.

 

 

Related Projects

Wood to Steel Replacement Segments

San Diego Gas & Electric's (SDG&E) Wood to Steel Replacement Program will replace approximately 5,500 existing wood transmission poles in San Diego County with tubular...

View Project
Rhinedollar 12 kV Distribution

Southern California Edison (SCE) commissioned the rebuild of the Rhinedollar Overhead Powerline, located within the Mono Lake Ranger District of the Inyo National Forest. The...

View Project
Troy Meadows 500 kV Segment

The Susquehanna-Roseland Electric Reliability Project is a 500 kV transmission line from the Berwick, Pennsylvania area to Roseland, New Jersey. Public Service Electric and Gas...